red safe light

At the Sink

The chemistry that was measured out earlier is already in the trays, arranged in order of left to right.

  1. Place and fully submerge each sheet X-ray film into the Developer tray for eight (8) minutes (D-76, straight solution).
  2. After the Developer, start moving the sheets one by one to the Stop tray for one (1) minute.
  3. After the Stop bath, move the sheets over to the Fixer bath and agitate for sever (7) minutes (after 5 minutes you can turn on the light but you don't have too).
  4. After these steps you will put the film into a print wash for ten (10) minutes.